Before pictures of the Kitchen area left side |
Stage 1 - I think for now the back splash, trim around the microwave, drain, faucet and window covering will be all that needs any real attention before we move in. The previous owner kept it very tidy so the only mess is the one we are making.
As you can see the wall paper/contact paper has bubbled and shrunk on the walls, they attempted to remedy this with a wood wall border a piece of paneling and lots of small screws.
The counter top is in decent condition other than needing to be tacked down on the far corner. And I know the stove has been used but it is in great condition, and VERY clean.
The bungee cord holding the refrigerator doors closed may be useful, but it just has to go!
Before pictures of the Kitchen area right side |
The kitchen faucet has to be replaced, water leaks out everywhere when you turn it on, as does the sink drain. No damage has been done so we assume it's something that has happened while it has been sitting.
I went down to Bison RV Center here in Clovis and got a new chrome one with a removable faucet sprayer head in an updated style. It's going to look amazing!
We will replace the window coverings and may put in an space saver coffee pot.
I will post more pictures after we get the demolition completed, and more after Stage 1 is complete.
Step 2 - 3 - 4- 5 We will do more later to include a convection oven instead of the microwave, a new counter top, flat surface stove top, smaller sink and a dishwasher.
No comments:
Post a Comment